SAE 1020 Cold Drawn Seamless Mechanical Tubing

SAE 1020 Cold Drawn Seamless Mechanical Tubing

Element I: Merchandise INTRODUCTION
one. Description: 
Mechanical tubing is a variety of metal tube widely used automotive market, engineering region, as effectively as machinery elements. Common specification of mechanical tubing is ASTM A519, masking carbon steel gardes and alloy metal grades. 

two. Commodity: SAE 1571 Chilly drawn seamless mechanical tubing

three. CZPT specification: ASTM A519, BS6323-4, CZPT specification.

four. Available metal grade: Various carbon metal and alloy steel grades such as but not restricted to the following:

ASTM A519: SAE1571,SAE1571,SAE1026,SAE1045,SAE1518,SAE1524,SAE1541, SAE4130,SAE4140,SAE4145,SAE4340,SAE8620
BS 6323-4: CFS3,CFS4,CFS5,CFS7,CFS8,CFS9,CFS10,CFS11
EN/DIN: ST35,ST45,ST52,E195,E235,E355,C35E,C45E,25CrMo4,34CrMo4,42CrMo4,

5. Size selection:

OD: upto 356mm
ID: upto 300mm
W.T: not constrained

6. Manufacture technique: Chilly rolled, Chilly drawn, CZPT cold drawn

seven. Shipping and delivery Situation:

BK BKW BKS GBK NBK Q+T
+C +LC +SR +A +N
Chilly rolled Cold drawn Pressure relieved Annealed Normalized Quenched+Tempered

eight. Stop end: simple finishes with sq. cuts,bevelled ends.

9. CZPT export packing: in bundles tied with steel strips. Inner and external oil coating. External packing by PVC bags and knit baggage.

ten. CZPTized packing or marking are CZPT upon request.

MECHANICAL TUBING WITH THICK WALL: 

MECHANICAL TUBING WITH Grade 4140 Q+T:

MECHANICAL TUBING With no Heat Managing:

Portion II: Often Questioned Queries
1. MOQ: 
3-5 tons/dimension for carbon steel grades, 10-20 tons/dimension for alloy steel gardes.
two. Supply Time: 20-30 days for carbon metal mechanical tubings, thirty-50 days for alloy steel mechanical tubings.
3. Guarantee&Promise: Guarantee&promise period is 6 months since we provide the tubes, and we are not accountable for high quality difficulty brought on by mistaken unloading or storage following cargo. We welcome customer’s inspection prior to cargo. 
four. Payment Approach: We accept payment technique like T/T, L/C, or D/P, but it relies upon on our investigation about customers. We have a solution to assess the credit of customers from all over the planet, and time and volume of D/P we can release is decided by the evaluation. 
five. Top quality Control: We purchase uncooked material from secure suppliers who are top steel mills, and we examine the raw materials as per the requirements. Throughout our production method, there is inspection and high quality manage in each stage.

Portion III: Business INTRODUCTION
We are a manufacturer of chilly drawn, cold rolled, and hydraulic cold drawn steel tubes with OD upto 356mm considering that 2002. Masking an region of about 32000M2, we have twelve common workshops with  two hydraulic chilly drawing benches, four chain chilly drawing benches, and 2 ERW mills. Our facilities addresses all the manufacturing processes from pickling, chilly drawing,heat dealing with,observed slicing, straightening,inspection,packing to further machining &turning, chilly drawing die fabrication, and gear repairation&maintenance.

Factory Visual appeal:

Uncooked Materials Stock:

Cold DRAWING DIE WAREHOUSE:

HYDRAULIC Chilly DRAWING:

Warmth Dealing with FURNACE:

MULTI-ROLLER STRAIGHTENING:

STRAIGHTENING BY Push:

Saw Reducing:

 

SAE 1020 Cold Drawn Seamless Mechanical Tubing

Tags